The information on the Job's WO Creator tab is used by this function to generate Work Orders for this Job. This Starter function will only be available in database that needs it. See Job Scheduling Overview for additional details.
See the Job Registry for the entries needed to Enable the WO Creator Tab and to Limit the Techs allowed on the WO Creator Tab.
See the Start Create Job Scheduler WOs Registry for the options needed to configure this function.
Start Date: End Date:
These fields define the range of Start Work Dates on the Job's WO Creator tab that you wish to create Installation Work Order. You may enter the dates in mm-dd-yyyy format or double-click on these fields to access the calendar viewer to do so.
Job Id:
If you wish to only create work orders for specific Job Id (or double-click to select from a list). Several Jobs may be specified by separating their Id's with a comma.
Click the Go button to continue.
This checklist appears immediately after the Create Job Schedular WOs starter function has been run so that you can verify which Installation Work Orders will be generated
Do
This field enables you to select which Installation Work Orders should be generated. A check appears in the Do field if an item is selected. Double-click on the Do field to select or deselect an item (or press the Spacebar when the caret appears on this field).
Job Id: Cost Code: Bill Item: Work Code Id: Equipment Id:
Work Start: EstiHrs: Tech Id: Cert Id:
These fields are displayed for informational purposes so that you can verify which PM's should be generated.
Click the Go button to generate the selected Work Orders.